Production Timeline Records

I got another call from them today. They are working on a project where they are confirming truck specs before sending color samples.

I just confirmed mine today. 2 calls in a week, I feel special :laughing:

But Collin said in the first call that I should be confirming my address in the next couple weeks. And if @Ben is correct, then its about 3 weeks until Im a month out from my “expected start of build” in June. Im just happy I waited and didnt try to jump the line. Patience is a virtue these days…

Build #1670 spot reserved on 10/29/202

3 Likes

Right behind you buddy. #1679 here. I just got a call from Kelly today confirming my truck (Tacoma DCSB) and if I was picking up or getting white glove service.

Couldn’t tell me anything else but I’m excited for my samples!!!

1 Like

I got a call from Kelly, too. 2020 Ranger Supercrew. Confirmed specs, #1558, not that it matters any longer :crazy_face::crazy_face:

1 Like

Updated for tracking:
#1601
Tacoma 3rd Gen DCLB
4/7 call to confirm specs and pickup/delivery (3rd gen DCLB)
4/15 email with survey to double confirm truck specs
4/20 email to confirm address for samples shipment :call_me_hand:
4/24 received color samples!
4/26 paid invoice!
6/5 received call for scheduling; earliest date available was 7/2

1 Like

#1931. Paid previous owner today and started the transfer request. Previous owner said it’s slated for a July build date.

Tacoma Gen 3 short bed. So pumped!

4/12: transfer requested
4/13: transfer complete
4/13: email confirmation stating welcome kit will be sent in “a few months”

#1498
3G ACLB Taco
Deposit Aug '20 Estimated build July '21
Invoice 3/21/21
Ready for Production 3/22/21
Install scheduled 5/14
Oh yea!

3 Likes

#1189
2013 Silverado 1500, 6.5 foot bed
Deposit 5/04/2020
Invoice 10/13/2020
Ready for Production 10/14/2020
Install scheduled 5/21/2021
Very stoked.

4 Likes

#1210
2020 GMC Sierra 2500 6.5+ bed
Deposit - Not sure, bought from another individual
Transfer - 10/27/2020
Invoice - 10/28/2020
Ready for Production - 4/7/2021
Install scheduled - 5/8/2021

Super excited! As I understand it, will be the first 2020 GMC 2500 GFC install!

3 Likes

#1426 received an email response that I should be receiving a call within the next week or two to schedule our install! 2021 Silverado 6.5’ bed.

1 Like

@TLee have you confirmed your address or gotten color samples yet?

Nope, not yet. Just patiently waiting. You?

Same here. Patiently

my color samples shipped today. Its progress of sorts.

What build number are you?

#1558 for a '20 Ford ranger Screw cab. They must be close to prototyping Rangers now.

2 Likes

I’m build #1788 and also have a SuperCrew 2019 Ford Ranger. I saw (on an Instagram story) they were taking measurements of the Ranger bed a few weeks ago, so hopefully you’re correct!

Color samples arrived, picked the options I wanted. I was hoping the red was a close match to Ford’s Rapid Red, but its closer to Race Red, so I went with the black panels and tangerine fabric, double tent doors and no windows with two black beef rack bars.

Expecting to be invoiced soon. Seems to be on track for the predicted adjusted build date of May timeframe.

I got emails from Taylor at Go Fast. I thought he moved to a different job?

2 Likes

Interesting I thought he left back in December myself. @GFC_Taylor are you still with GFC?

@crazyfingers is correct, I promoted myself to customer (lol). I used to have all of the answers, now I have exactly zero answers. Sorry y’all!

2 Likes

Lol, I used to say that at another job where I did Customer service. “Promoted to customer”.

Must be an automated system set up to use Taylors name and no one knows how to change it now. Or they hired his cloned self, haha.

2 Likes